Guideline to Develop Project or Program Assumption
The following guideline will help the development organizations or NGO to develop the assumption during project design.- Starting from the bottom up of the narrative summary examine what are the external factors for each level that must exist to achieve the next higher level.
The external factor that may hinder the implementation or attainment of the next highest level of the project and it must have to possible to overcome by the staff or management efforts. Then it can be added as assumption.
- Some important assumptions can be divided from the objective tree which are not incorporated into the project.
- Assumptions will be worded as a positive condition such as the natural calamity will not disrupt the project performance.
- Assumption will be weighted according to importance and probability