Determining Assumption during project design

Determining Assumption during project design :

Assumptions reflect our recognition that there are factors beyond our control that are necessary for successful achievement of objectives at all levels of the project. In this regard assumptions are beliefs held by the project designers about the environment in which the project takes  place.
So by identifying assumptions we have expanded our original hypothesis statement to include the specific nature of the more important uncertainties that could affect the hypothesis.
Since the entire logic of the hypothesis is built on certain assumptions, it is extremely important to identify them. Once the assumptions are identified, we can then try to deal with them in such a way as to increase our probability of success.
For the example of “Farmer” if it is found that although farmers are trained on improved planting method but due to lack of capital they are not able to adopt it. In that case the project can help farmer by providing credit. But if the project has no fund for credit, it can establish linkages with other credit sources. It linkages are also difficult, then project objectives, even the whole project could be modified. So once we have identified as many critical assumptions as possible with the information at hand or you have, it is then the proper time to look more closely at each assumption. At the same time you need to assess the importance of each assumption. All those processes will enable a project planning team to design a project that could balance all the assumed constraints or barriers.