Sample Terms of Reference (TOR) for evaluating the Strengthening Local CBO-NGOs Project implementing by lead and partner

Sample Terms of Reference (TOR) for evaluating the Strengthening Local CBO-NGOs Project implementing by lead and partner :
Introduction:
SF and SSP agreed in developing and implementing a Project called “ Strengthening Local NGOs and
CBOs Project”  aimed at creating access of small NGOs and CBOs to economic resources  and its sustainability; developing organizational and management capacity of small NGOs and CBOs; improving collaboration with joint harnessing and utilization of local resources and developing human resources and technical expertise of the participating NGOs and CBOs which will ultimately result in increase of economic level of needy people in society to enable them to improve their standard of living to become able to support their families without continued dependence from external sources. This Project shall benefit the population without regard to race, sex, religion or political opinion.

Task of the Consultant:
In close consultation with project management and reviewing office document, interviewing and discussion with primary stakeholder and secondary stakeholder, the consultant will examine project achievement. The consultant will particularly capture
the following aspects of  the projects:
1.    Review results achieved against original plan
2.    Assess the process, strategy or methodology of implementation.
3.    Analyze the efficiency and adequacy of project implementation, including the project activities and its progress, overall performance of the project management.
4.    Evaluate the effects of the project at beneficiary level, local level and macro level.
5.    Assess the progress of the sustainability of the program at different level.
6.    Assess the phase out strategies of SSP regarding implementation of the project.
7.    Assess the existing monitoring system, effectiveness and steps to be taken.
8.    Assess the gender equity as a cross cutting issue at management level and implementation level.
9.    Assess the status of the beneficiaries level in terms of empowerment (economic and social)
10.    Assess the outcome of the Shonglap program implemented by the CBOs-NGOs.
11.    Assess the result of the training provided on capacity building for the staff of CBO-NGOs at different level.
12.    Assess the capacity on the implementation of the CBOs-NGOs on micro finance.
13.    Analyze the operational sustainability and financial sustainability of the micro finance activities.
14.    Using participatory methods and involving all stakeholders (beneficiaries and other stakeholders) assess the strength and constraints of the project.
15.    Sketch practical recommendations to strengthen project
16.    Prepare a evaluation report addressing above mentioned issues
17.    Assess quality of SSP capacity building support to NGOs and CBOs and recommend how it can be strengthened
18.    Assess Capacity of NGOs and CBOs to deliver the project objectives.
19.    Consultant to provide, with justification, judgment on overall project performance: Outstanding, very good, good and/or unsatisfactory
20.    Debriefing to   SSP  and SF management
Stakeholders to be consulted:
•    Implementing partner of SF
•    Implementing partners of SLCP
•    Loan borrowers and savers
•    IGA implementers
•    Staff of CBOs/NGOs
•    Management of implementing partners of SF and SLCP
•    SST members,
•    Shonglap Animators
•    Shonglap graduated girls
•    Parents of Shonglap girls

Methodology:
The consultant will conduct the assessment applying participatory method i.e. focus group discussion, mobility mapping, ranking etc

The necessary process require to be complied during conduction of Evaluation
•    Project team will assemble project evaluation specific documents for the external consultant as and when required.
•    Project team will debrief to external evaluator about their organization and project
•    Consultant will set methodology and prepare a plan to visit field
•    Consultant will submit methodology and field visit plan to SSP and SF.
•    Conduct field visit and collect data
•    Analyze data in the line of project objectives
•    Prepare report not more than 25 pages (one page executive summary, other relevant important information in annexes)     

Composition of the Team Members of the Consultants:
The evaluator team would be consisting of three members:

3 members team will evaluate the project

External Consultant’s Input Days:
Input days have been determined based on 27 CBOs/NGOs of which 1/3 will be visited and assessed  in details. The total inputs day of the consultant has been made 42 days.

- Secondary document review                1 day
- Setting methodology and preparations of tools     3 days
- Pre-assessment workshop with partners         1 day
- In-depth assessment of CODEC              1 day
- In-depth assessment of 7 CBOs/NGOs        10 days
- Travelling days                     6 days (Ctg., Noakhali,  Patuakhali and Bagerhat)
- CBO wise data compilation            8 days
- Report writing                    8 days
- Debriefing                     1 day
- Finalizing report                 3 days
Total                         42 days

Deliverables: the consultant will deliver an analytical report in English (both hard and soft copy) not more than 30 pages excluding annexure.

Time frame: The consultant must deliver the final evaluation report before the end of February, 2012

Termination of the Agreement:
•    Only the SF and consultant will have the  authority to terminate  this agreement with 15 (fifteen) days notice.
•    If the External Consultant can’t fulfill any clause of Terms of Reference.
•    If the External Consultant can’t submit their reports within the specified time

General Terms and Condition:
a)    Any document, information or data entrusted to or produced by the External Consultant in connection with this assignment shall be strictly confidential and cannot be used by the External Consultant for any other purpose without the written consent of the SF and SSP authority. This provision shall remain valid even after the completion of this assignment.

Accepted by           


External Consultant            SF contact person         SSP
Date:                                 Date:                             Date: