The Session plan to Exercise on Developing Data Collection instruments:
Goal: To allow participants to practice on developing monitoring tools.
Objectives: Just By the completion of the session, the training participants would be able to develop a
monitoring tool considering the indicators and data to be collected through using the tool, which will enhance the participants skills and confidence.
Duration: 1 hour 30 minutes
Methods: Exercise in Small Group
Materials: Transparency (TS): 5.4.1, 5.4.2, 5.4.3
Handout: 5.4.1 – Case Study “Sanitation & Hygiene Project of IKRA”
Facilitator’s Preparation:
Facilitator(s) will ready the exercise sheet completed by the participants in the session 4.1 on identification of indicators and data. Participants will develop tool in this session based on those indicators and data.
Process: Step I: Defining Objective of the Session (10 min)
Explain participants that over the last few sessions they discussed about -
• Indicators and data, their categories
• Data collection tools and techniques
• Frequency of data collection
• Who will collect the data, etc.
In this session, they will practice how to develop a tool for data collection using information provided in the case study ‘Sanitation and Hygiene Promotion project of IKRA’ that they used once in the session 4.1. Instruct participants to use the indicators and data they identified against different interventions of this case study in the session 4.1. Using all these information, their task is to develop a draft tool in this session, using which data and information will be collected from the field on the respective intervention. Give an idea how to structure a monitoring tool. At this stage distribute TS 5.4.1, 5.4.2 and 5.4.3 among the participants and explain that these are given them as for examples to show how a participatory monitoring tool is designed depending on the nature of program. Reinforce them to keep a point in mind when designing PME tool is the scope for participation of the beneficiaries in the M&E system.
Step II: Exercise on Developing Monitoring Tools (50 min)
Divide the participants into four small groups. Ask each small group to chose any one intervention from the case study for which they will develop a tool. Provide flip chart paper and marker to each group and allow nearly a hour to develop the tool. Assist small groups with necessary clarification and instruction where needed in developing the tool.
Step III: Presenting the Monitoring Tool Developed by Participants (30 min)
At the end of given time, ask small groups to merge into large group and present their monitoring tools. Instruct participants to follow the tool while presenting by a group and providing constructive feedback to the group for further improvement of the tool. Allow all the four groups to present their tools one by one. At the end of presentation, thanks participants for their sincere and hard works on developing monitoring tools. Inform that the time they exercised on developing a tool was not enough, but this gave them an opportunity to think about the importance of developing such tools by themselves for monitoring information collection of their development programs. Finally conclude the session with thanks to the participants.
Goal: To allow participants to practice on developing monitoring tools.
Objectives: Just By the completion of the session, the training participants would be able to develop a
monitoring tool considering the indicators and data to be collected through using the tool, which will enhance the participants skills and confidence.
Duration: 1 hour 30 minutes
Methods: Exercise in Small Group
Materials: Transparency (TS): 5.4.1, 5.4.2, 5.4.3
Handout: 5.4.1 – Case Study “Sanitation & Hygiene Project of IKRA”
Facilitator’s Preparation:
Facilitator(s) will ready the exercise sheet completed by the participants in the session 4.1 on identification of indicators and data. Participants will develop tool in this session based on those indicators and data.
Process: Step I: Defining Objective of the Session (10 min)
Explain participants that over the last few sessions they discussed about -
• Indicators and data, their categories
• Data collection tools and techniques
• Frequency of data collection
• Who will collect the data, etc.
In this session, they will practice how to develop a tool for data collection using information provided in the case study ‘Sanitation and Hygiene Promotion project of IKRA’ that they used once in the session 4.1. Instruct participants to use the indicators and data they identified against different interventions of this case study in the session 4.1. Using all these information, their task is to develop a draft tool in this session, using which data and information will be collected from the field on the respective intervention. Give an idea how to structure a monitoring tool. At this stage distribute TS 5.4.1, 5.4.2 and 5.4.3 among the participants and explain that these are given them as for examples to show how a participatory monitoring tool is designed depending on the nature of program. Reinforce them to keep a point in mind when designing PME tool is the scope for participation of the beneficiaries in the M&E system.
Step II: Exercise on Developing Monitoring Tools (50 min)
Divide the participants into four small groups. Ask each small group to chose any one intervention from the case study for which they will develop a tool. Provide flip chart paper and marker to each group and allow nearly a hour to develop the tool. Assist small groups with necessary clarification and instruction where needed in developing the tool.
Step III: Presenting the Monitoring Tool Developed by Participants (30 min)
At the end of given time, ask small groups to merge into large group and present their monitoring tools. Instruct participants to follow the tool while presenting by a group and providing constructive feedback to the group for further improvement of the tool. Allow all the four groups to present their tools one by one. At the end of presentation, thanks participants for their sincere and hard works on developing monitoring tools. Inform that the time they exercised on developing a tool was not enough, but this gave them an opportunity to think about the importance of developing such tools by themselves for monitoring information collection of their development programs. Finally conclude the session with thanks to the participants.