Searching ...
Monday, June 24, 2013

Session plan on Developing Logical Framework of a development project or program

Session plan on Developing Logical Framework of a development project or program:
Goal:    To enable participants practicing on preparing logical framework and clarify their ideas on the total aspects of logical framework development through practice.
Objectives:    By or after the end or completion of this session, the participants will be capable enough or able to:
1.    Explain project hierarchy and project hypothesis while in the process of developing logical framework.
2.    Practice on preparing logical framework on the problems they analyzed in the session 4.3.
3.    Clarify various aspects that one should be careful while preparing a log-frame to address a problem.

Duration:     2 hour 15 minutes

Methods:    Group Discussion, Small Group Works, and Presentation

Materials:    Transparency (TS):   
    Handout:    3.6.1     Sample logical framework

Facilitator Preparation:       
In this session, participants will practice the preparation of log frame in small groups using the problem analysis they did in the session 5.3. Therefore facilitator will ensure the output of the session 5.3, i.e. the problem tree is there for the use of the respective small group again. S/he will also ready the sample log-frame that is attached in this session for distribution to the participants as a reference to see how a complete log-frame looks like. Other log-frame may also be used.
Process:    Step I: Introduction to the Session (5 min)
Explain participants that in this session they will practice how to prepare a logical framework as a part of project proposal. Ask participant to remember the session 3.4 where they developed problem tree and objective tree also the session 3.5 in which they learnt about alternative analysis. In this session, they have to develop a logical framework to reduce the manifestation of the key problem they identified in the session 3.4 by addressing one or more or all the alternatives that they identified in the session 3.5.

Step II: Project Hierarchy and Project Hypothesis (30 min)
Before assign participants to work on preparing logical framework, explain the concept of project hierarchy and project hypothesis to the participants showing TS 3.6.1 & 3.6.2. Mention that the objectives that will be achieved by a project at different level are shown hierarchically in the logical framework and this hierarchical achievement of the project objectives is called as the project hierarchy. The levels of objectives in a logical framework remain arranged in five sequential and progressive orders start from input and ended to the project goal.
Explain project hypothesis saying that it is nothing but to realize- under what preconditions the objective achieved at a level through certain activities help to the achievement of the objective in the next level. In project hypothesis construction, project risks and assumptions are mainly identified and assumed these will remain under favorable conditions.

Step III: Instruction to Participants on Developing Logical Framework (10 min)
Distribute Handout 3.6.1 a sample logical framework prepared before to the participants and ask them to have look into the framework- to see how the goal, objectives, outputs, etc. are stated it the narrative summary column and besides to that how the OVI, MOV and Assumptions/Risks are written linking with project objectives at different level. Mentioned that their task in small groups is to prepare such a logical framework on the problem they discussed in the session 3.4 considering the alternatives they identified to address the problem in the session 3.4. Instruct them to prepare the logical framework up to output and only one output will be enough to identify for exercise purpose.
After giving instruction how to prepare the logical framework, now divide the participants into small groups. The small groups should be formed with the same participants who worked together in the small groups during session 5.3 while preparing problem tree.

Step IV: Preparation of Logical Framework by the Participants (60 min)
Help the small groups to get a suitable place in the training room to sit in round and post the problem tree that they developed during the session 5.3 some where so that they can see it while developing logical framework. Allow participants about an hour to work in small group to prepare the logical framework in the flip chart paper that you supplied before. Watch the activities of the small groups while they preparing the logical framework and assist them if they face any difficulties anywhere to understand the subject matter.

Step V: Presenting Logical Framework Prepared by the Participants (30 min)
At the end of given time, ask the small groups to display their logical frameworks in the training room. Ask participants to review the logical frameworks on display by moving around and write their comments. When all the participants reviewed each of the logical frameworks, ask them to take their sit and give their points they wrote as comments on the logical frameworks. Discuss the comments and concerns one by one and clear the total concept how to write the narrative summary, OVI, MOV and assumptions of a log-frame. After clarifying all aspects that need to know by the participants on log-frame, conclude the session with thanks for bearing with you in such a long and critical session.