The PM&E in all stages or part of project life cycle:
PM&E in fact is an issue should be prioritized in all stages of project life cycle. When consideration for M&E is not included from the earliest stage of project planning, the M&E systems may be constrained by the
design of the preliminary assessments. The possible limitations include lack of specificity in the project log frame (e.g., vague project objectives and outputs, or unclear indicators and means of verification). And designs for information management that simply extract data without actively involving the target population in planning and implementation of the system.

Project documents (and their ‘log frames’) are an important tool for project management, but they do not usually contain sufficient detail when it comes to information systems. Log frames do list some essential items for planning information management: desired information (as ‘objectively verifiable indicator’) and sources of information (as ‘means of verification’). These two categories, however, do not include any answers for the following key questions:”
Key information system requirements not included in standard Log Frames

•     How will the information or data be gathered? Who the people will collect it? When will it be obtained?
•     How will the gathered data or information be analyzed? Who will analyze it? When will the analysis be done?
•    Who will receive the results? In what format will they be distributed? And what decisions in (or about) the project are dependent on getting the analyzed information?

Recognizing that the log frame does not provide enough detail by itself for creating the M&E plan, it is necessary to develop a strategy for generating the missing elements. A useful way to do this is to prepare and complete a Monitoring and Evaluation Planning Matrix that expands the Log Frame matrix to include the key elements of an M&E plan (shown in the chart).