Identification of the measures to mitigate risks (with examples) :
Description of risks
1. Due to heavy rain 2 k.m. kacha road of Radhanagar could become unusable to transport
Risks mitigation measures:
1.1 Repairing 2 k.m. road of Radhanagar
1. 2 Making 1 bridge/culvert on the road
1.3. Planting trees on the roadsides
1.4 Forming local committee for road repair and maintenance
Description of risk
2. Nor’wester may blow the tin and wood of 4-5 education institutions of sadar union
Risks mitigation measures:
1.1. Rising the plinths of the educational institutions
1.2. If possible building concrete construction
Description of risks
1. Due to heavy rain 2 k.m. kacha road of Radhanagar could become unusable to transport
Risks mitigation measures:
1.1 Repairing 2 k.m. road of Radhanagar
1. 2 Making 1 bridge/culvert on the road
1.3. Planting trees on the roadsides
1.4 Forming local committee for road repair and maintenance
Description of risk
2. Nor’wester may blow the tin and wood of 4-5 education institutions of sadar union
Risks mitigation measures:
1.1. Rising the plinths of the educational institutions
1.2. If possible building concrete construction