All of these decisions about the scale of the project interventions must be made in light of budgeting concerns. Those designing the project must take into consideration the amount of funds necessary to hire appropriate levels of staff, provide logistical support, bring in a consultant if desired, and run the project for the desired duration.
At times decisions about project design will have to be revised or adjusted based on an assessment of how realistic budget amounts are. Sometimes the project must be dramatically rescaled, concentrating on a smaller geographical area with fewer beneficiaries, for example in order to develop a design which can be realistically funded.

It is helpful at this point to prepare a line item budget which includes the specific staffing and logistical requirements for the project. The overall budget should include budgets for each year of the project  individually and for the multiple years of the entire duration of the project.

Being as precise as possible at this point will help to avoid problems and difficulties later. Breaking down expenditures for each year, including costs of monitoring and evaluation as well as interventions, is essential. From these detailed budgets a summary of long range costs can be determined by adding up each year over the duration of the whole project. The overall figure is the amount which must be sought from donors, but it is crucial to be able to demonstrate to potential donors that the overall number is based on a careful breakdown of costs for each year.

Summary of the budget part
An initial budget breakdown will help to determine how realistic the project design is, based on estimated staffing and resource needs to implement the project.