PROJECT ACTIVITIES NEED TO BE ACCOMPLISHED DURING CONSTRUCTION PHASE FOR PIPE WATER SUPPLY PROJECT
1. Construction of water treatment plant: Construction of entire treatment plant need to be accomplished as per design specification.2. Construction of pipe lines and taps stand: Construction of pine lines and tap stands require to be accomplished timely including platform, drainages, switch valve and washout chambers etc.
3. Installation of pumps, motors and electrification: Pumps and motors installation works including electrification also need to be accomplished fully.
4. Pressure test of the pipe line: Accomplished.
5. House connection: House connection for piped water supply need to be started as early as possible. Household visit, individual contact, para wise meeting, and other promotional campaigns need to be conducted to increase the number of connection. It is expected that more households will take the connection .
6. Establishment of project management committee and sub-committees: An 11-member a central project management committee will require to be formed involving users, elites and local government administration. Two other sub-committees are also be needed in two villages to help the central management committee.
7. Opening a joint bank account: A joint bank account have to be opened in a scheduled Bank for maintaining all financial transaction of the project. The bank account operates jointly by three signatories. They are President, Secretary and Cashier of the central management committee.
8. Preparation of Operation & Maintenance manual and operators training module: Preparation of operation and maintenance (O&M) manual and caretakers/operators training module require to develop.
9. Orientation to the management committees: CDIP has to conduct sufficient number of orientation sessions with the management committee and sub-committees to educate them on the operation and maintenance system of the plant.